Applied Engineering Ltd has completed multiple major civil construction projects including substantial site works and subdivision developments in Huntly and Putaruru as the Principle Contractor which included:

· Major excavations/earthworks;

· Roading including kerb & channeling, construction of medium strips on a highway;

· New entranceway installations for subdivisions;

· Major concrete works including carpark upgrades, concrete storage pads, silo foundations, foundations for

 aerial pipe works, fuel supply and storage sites ;

· Retaining walls and Fencing projects;

· Water and wastewater engineering and construction works;

· Farm Irrigation systems;

STOCKMAN ROAD, MORRINSVILLE

STOCKMAN ROAD, MORRINSVILLE

Private Subdivision comprising 15 Sections involving earthworks, construction of clay earth bund for pond, supply, excavate and installation of all services (stormwater, wastewater, water reticulation, utility services), road pavement (chip seal & asphalt), vehicle entrances & crossings, concrete works and environmental management

Stockman Road, Morrinsville

Stockman Road, Morrinsville

Piopio Reservoir: Waitomo DC

Piopio Reservoir: Waitomo DC

Preparation and installation of a 500kL Potable Water Storage Tank (in conjunction with Tasman Tanks Ltd)

GENESIS - NEW  LGP DEPOT

GENESIS - NEW LGP DEPOT

Mainstreet Place, Hamilton - Completed Genesis LPG depot

GENESIS - LPG DEPOT

GENESIS - LPG DEPOT

Site preparation involving sheetpiling and dewatering for the placement of new LPG tank

MATANGI - SUBDIVISION ENTRANCEWAY

MATANGI - SUBDIVISION ENTRANCEWAY

Development of new subdivision including new entranceway, roading, kerb & channel and stormwater

TE RAHU SUBDIVISION

TE RAHU SUBDIVISION

20 Residential sections involving major earthworks, construction of retaining walls, stormwater and wastewater services, roading and site stabilization

AOTEAROA PARK DEVELOPMENT

AOTEAROA PARK DEVELOPMENT

Re-development of Industrial Site at Cambridge - cut to fill operation to create 3 flat sections from rolling contour paddock

AOTEAROA PARK DEVELOPMENT

AOTEAROA PARK DEVELOPMENT

Clearing, stripping and removal of materials, vegetation and unsuitable subgrade. Preparation of pavement subgrades for asphalt & chip seal surfacing. Construction of catchpit and stormwater pipeline connection.

BRANDERSON HOMES LTD

BRANDERSON HOMES LTD

Duke Street, Ngaruawahia - New subdivision preparation - roading, kerb & channel, stormwater and wastewater and all services

KAHOREKAU & OTOROHANGA RESERVOIRS

KAHOREKAU & OTOROHANGA RESERVOIRS

Completed Foundation Pads and tank installations for both Kahorekau Reservoir Replacement and Otorohanga Reservoir Replacement (In conjunction with Tasman Tanks NZ Ltd)

ROSELAND PARK RETIREMENT VILLAGE

ROSELAND PARK RETIREMENT VILLAGE

Development of site for further retirement homes involving earthworks, stormwater, wastewater, roading, kerb & channel and all services

ROSELAND RETIRMENT VILLAGE, HAMILTON

ROSELAND RETIRMENT VILLAGE, HAMILTON

Plan of proposed new development at Fox Street, Hamilton

LGS

LGS

Construction of Vaporiser pad, compound fences and gates for LGP vessel

Installation of Wastewater Treatment

Installation of Wastewater Treatment

FOR INNOFLOW TECHNOLOGIES LTD AT FONTERRA HAUTAPU PLANT Major excavation for and installation of six 25,000 litre in-ground tanks. Installation of 10 kilometres of disposal field dripper line piping. Assisting with plumbing fit-out, construction of access track and building foundations. General landscaping and silt control of work site.